More experience means smarter solutions in engineered material handling projects

Timberland sees more possibilities in your engineering challenges because we have already seen more solutions for winching, hoisting and tensioning requirements than any other source in the industry.

Our experience lets us bring more insight to create the best possible solution for your needs - quickly. We have handled the heaviest loads, the highest lifts and the most valuable payloads. We have done it on land, on sea and underground. We have done it on every continent and under the most extreme climate conditions.

We have been doing it for more than 60 years.

Give your project a running start

Timberland is ready and willing to share our insights early in the project’s development, when our experience can provide the most value. When your opportunity is greatest and the challenges are still unknown, look to the people who have “been there,” and got the job done before: Timberland people.

See our experience in action: Get a closer look at our products and projects portfolio in:

Projects

San Francisco - Oakland Bay Bridge

This bridge reconstruction project called for safely lifting and positioning massive 750-ton precast bridge segments delivered on barges.

Highline Lift System

The Hoover Dam Bypass urgently needed a fast-track replacement for its highline lift system after its original cranes were swept away by gusting winds.

Kiewit Heavy Lift Device

The Kiewit HLD in Texas relies on precise synchronization of multiple hoists to safely handle loads of up to 13,000 tons.

FPSO Tower Mooring and Loading System

Effective project coordination resulted in a successful deep-water deployment in China’s Bohai Bay oil field.

P-56 Riser Pull-In and Mooring Tensioning

Sophisticated control systems provide this FPU with highly reliable automatic self-correcting operation.

Bisso Marine Towing System

Integrating a new double-drum towing winch and controls into this 2400 HP tugboat required a close fit with available deck space and hydraulics.

Zhangji Mine Emergency Egress

This truck-mounted MRH emergency egress system allows dramatically faster response to maintenance problems deep in the Zhangji Mine in China.

Jiangsu Power Puller & Tensioner

Jiangsu Power Company was able to erect a 500 kV transmission line through rugged central China with our 28-ton puller and 20-ton tensioner.

Puller-Tensioner Reconductor System

This versatile all-in-one solution minimizes the amount of equipment needed to upgrade electrical distribution lines in confined work areas.

2-bundle + OPGW stringing in Costa Rica

The custom engineered puller-tensioner system from Timberland included a trailer-mount able to travel at highway speeds.

Diavik Diamond Mine - NWT

Marcotte expedited delivery of equipment for new underground operations before ice roads to the mine melted with the Spring thaw.

News

Hawboldt - Inshore Science Vessels
<More>


Hawboldt - Deck Equipment, Mid-Shore Patrol Vessels
<More>


Tools

Customer File Exchange

YouTube Channel

DCRC Derrick Capacity & Reaction Calculator

QuikPik Tensioning Equipment Selector

The System Conductor Stringing Planners

Product Data

Accessories Ordering