This bridge reconstruction project called for safely lifting and positioning massive 750-ton precast bridge segments delivered on barges.
Highline Lift System
The Hoover Dam Bypass urgently needed a fast-track replacement for its highline lift system after its original cranes were swept away by gusting winds.
Kiewit Heavy Lift Device
The Kiewit HLD in Texas relies on precise synchronization of multiple hoists to safely handle loads of up to 13,000 tons.
FPSO Tower Mooring and Loading System
Effective project coordination resulted in a successful deep-water deployment in China’s Bohai Bay oil field.
P-56 Riser Pull-In and Mooring Tensioning
Sophisticated control systems provide this FPU with highly reliable automatic self-correcting operation.
Bisso Marine Towing System
Integrating a new double-drum towing winch and controls into this 2400 HP tugboat required a close fit with available deck space and hydraulics.
Zhangji Mine Emergency Egress
This truck-mounted MRH emergency egress system allows dramatically faster response to maintenance problems deep in the Zhangji Mine in China.
Jiangsu Power Puller & Tensioner
Jiangsu Power Company was able to erect a 500 kV transmission line through rugged central China with our 28-ton puller and 20-ton tensioner.
Puller-Tensioner Reconductor System
This versatile all-in-one solution minimizes the amount of equipment needed to upgrade electrical distribution lines in confined work areas.
2-bundle + OPGW stringing in Costa Rica
The custom engineered puller-tensioner system from Timberland included a trailer-mount able to travel at highway speeds.
Diavik Diamond Mine - NWT
Marcotte expedited delivery of equipment for new underground operations before ice roads to the mine melted with the Spring thaw.